CMP SUBSTATIONS
- Project Location:
- Bristol, ME
- China, ME
- Sanford, ME
- Services Provided:
- Geotechnical consulting
- Test borings were performed for each site to investigate subsurface conditions
- Project Summary:
- New substations were constructed to replace existing substations
- Structures included transformers, bay structures, transmission lines, substation yards, control houses, and other associated elements of the substations
- Project Challenges / Innovation:
- Wide range of subsurface conditions including fill, alluvial sands, glacial till, and shallow bedrock
- SGS conducted resistivity testing for each site using the Wenner 4 Probe method
- Geotechnical design included a range of challenges from earthwork cut/fills, global slope stability, changes in subgrade conditions, various foundation systems (footings/piers/piles), frost design, seismic design, and corrosion potential