LINCOLN ACADEMY -- TECHNOLOGY CENTER & DORMITORY
- Project Location: Newcastle, ME
- Services Provided:
- Geotechnical consulting
- A combination of test borings with SPT sampling and seismic cone penetration tests (CPT)
- Project Summary:
- The technology center is a single-story building with a footprint of 7,000 square feet, constructed on a hillside requiring a significant bedrock cut
- The dormitory is a 3-story building with a footprint of 11,000 square feet and a full basement foundation
- Project Challenges / Innovation:
- Bedrock was processed onsite for reuse as engineered fill; additional quantities were trucked offsite
- The dormitory was underlain by miscellaneous fill and marine deposits requiring over-excavation and stabilization with geotextile and crushed stone
- Subgrade inspections were performed during construction to verify rock competency for ledge pinning of the foundation for the technology center and for subgrade stabilization used for the dormitory