Davis Stream Culvert Replacement
DAVIS STREAM CULVERT REPLACEMENT Project Location: Washington, Maine Services Provided: Geotechnical explorations (test borings) Laboratory testing Geotechnical consulting Project Summary: Replacement of double barrel culvert at roadway crossing over Davis Stream. Construction of new 40-foot clear span pre-engineered bridge to reduce stream disturbance and enhance crossing. Project